| Peer-Reviewed

The Building Structure of the New Crown Nucleic Acid Testing Laboratory Was Quickly Constructed Several Program Studies

Received: 28 July 2022     Accepted: 20 August 2022     Published: 29 August 2022
Views:       Downloads:
Abstract

Natural disasters, especially major infectious disease outbreaks, have brought very heavy disasters to human beings. The novel corona-virus pneumonia that broke out at the end of 2019 has spread to many countries around the world. It has been more than two years so far, and the world's public health security is facing great challenges. Faced with the urgent new demand for new crown testing, laboratory buildings must be fast, flexible and low-cost. This paper introduces the essential requirements for rapid laboratory construction, airflow control, negative pressure environment, and cleanliness under the emergency of COVID-19 testing, and discusses the traditional laboratory construction scheme and new modular air-film structure scheme for rapid laboratory construction at present., box-type container mode scheme; the innovation of the new modular air-film structure product developed has the characteristics of positive and negative pressure conversion, intelligent integration, and environmentally controllable features, which can meet the inherent requirements of the current nucleic acid virus detection, and can be used in A total of 370 Fire Eye laboratories (283 domestic and 95 international) have been launched in 37 countries and regions to help prevent and control the global epidemic.

Published in Science Discovery (Volume 10, Issue 4)
DOI 10.11648/j.sd.20221004.18
Page(s) 255-262
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2022. Published by Science Publishing Group

Keywords

Natural Disasters, Rapid Construction, Temporary Buildings, Positive and Negative Pressure Conversion, Air Conditioning Intelligent Systems

References
[1] 张季超等,土木工程事故处理[M].北京:科学出版社,2012.03。
[2] COVID-19 Dashboard [EB/OL]. the Center for Systems Science and Engineering (CSSE) at Johns Hopkins University (JHU). https://coronavirus.jhu.edu/map.html,2021.
[3] 沈国兵,徐源晗,袁征宇. 新冠疫情全球蔓延对我国就业的影响及机制分析[J]. 经济问题探索,2021,(12):1-12。
[4] 佘宗全. 新冠肺炎疫情爆发初期武汉市政府应对行为研究[D].云南财经大学,2021。
[5] 曾永明,骆泽平,杨敏,等. 人口流动与城市早期新冠肺炎疫情空间扩散及分布关系研究[J]. 人口与社会,2020,36(5):69-84。
[6] 李梅. 定点医院在新冠肺炎疫情中的应急管理探讨[J]. 科技与创新,2020,(5):109-111。
[7] 彭冠平,黄文海,刘军,等. 武汉火神山、雷神山医院污水处理工程设计[J]. 中国给水排水,2021,37(2):42-48。
[8] 陈朝阳,王腾,刘宇太,等. 以科技力量成就抗“疫”的“中国速度”——中建三局武汉火神山、雷神山医院优质高效建成背后的秘密[J]. 建筑,2020,(6):51-53。
[9] 王露莹,陈品儒,郑国湾,等. 新型冠状病毒检测方法的研究进展[J]. 现代药物与临床,2020,35(3):411-416。
[10] 钟慧钰,赵珍珍,宋兴勃,等. 新型冠状病毒核酸临床检测要点及经验[J]. 国际检验医学杂志,2020,41(5):523-526。
[11] 姚璜,杨盛力,魏守蓉. 新型冠状病毒肺炎应以防控为首[J]. 医药导报,2020,39(3):327-329。
[12] 楚廷勇. 中国医疗保障制度发展研究[D].东北财经大学,2012。
[13] 乌日图. 医疗保障制度国际比较研究及政策选择[D].中国社会科学院研究生院,2003。
[14] 张晔. 上海市第一人民医院新建医疗综合楼结构设计[J]. 建筑结构,2016,46(1):71-74+81。
[15] 刘男. 防控突发性传染病的医疗建筑网络结构研究[D].哈尔滨工业大学,2015。
[16] 斯塔夫·里诺. 医院建筑方案设计中的问题研究[J]. 城市建筑,2021,18(35):148-150。
[17] 吕达,程美涛,陶蕊. 应急医院建筑项目的装配式设计与施工[J]. 建筑施工,2021,43(5):751-753。
[18] 林广成,周义凯,蒋飞远,等. PVC耐辐照材料的制备及性能研究[J]. 聚氯乙烯,2021,49(12):16-18+25。
[19] 唐敢,黄李纲,杜元开,等. 医用聚氯乙烯材料的研究进展[J]. 塑料工业,2021,49(12):1-6。
[20] 曹沐凡,王志伟,林锦路,等. 一种可折叠的物流配送飞行汽车的设计、控制和验证[J]. 科技与创新,2021,(22):71-72+74。
[21] 王瑞林,魏媛杰,邹明利,等. 可折叠快递周转箱设计[J]. 科学技术创新,2020,(33):165-166。
[22] 陈戊荣,陈兆荣,苏运升,李雯琪,尹烨,李若羽. 超短临时建筑核酸检测实验室设计若干技术研究[J]. 建筑结构,2022,52(S1):704-708。
[23] 陈戊荣,陈兆荣,苏运升,李雯琪,尹烨,温丽娟,李若羽,陈唯军. 气膜性建筑结构核酸检测实验室的创新设计研究[J]. 建筑结构,2022,52(S1):698-703。
[24] Chen Wurong, Su Yunsheng, Chen Zhaorong, Li Wenqi, Yin Ye, Wen Lijuan, Li Ruoyu, Chen Weijun. Innovative Practice of Key Technologies in Nucleic Acid Detection Laboratory of Gas Membrane Building Structure [J]. Science Discovery, 2022, 10 (1).
Cite This Article
  • APA Style

    Li Wenqi, Chen Wurong, Chen Zhaorong, Su Yunsheng, Cai Zhili, et al. (2022). The Building Structure of the New Crown Nucleic Acid Testing Laboratory Was Quickly Constructed Several Program Studies. Science Discovery, 10(4), 255-262. https://doi.org/10.11648/j.sd.20221004.18

    Copy | Download

    ACS Style

    Li Wenqi; Chen Wurong; Chen Zhaorong; Su Yunsheng; Cai Zhili, et al. The Building Structure of the New Crown Nucleic Acid Testing Laboratory Was Quickly Constructed Several Program Studies. Sci. Discov. 2022, 10(4), 255-262. doi: 10.11648/j.sd.20221004.18

    Copy | Download

    AMA Style

    Li Wenqi, Chen Wurong, Chen Zhaorong, Su Yunsheng, Cai Zhili, et al. The Building Structure of the New Crown Nucleic Acid Testing Laboratory Was Quickly Constructed Several Program Studies. Sci Discov. 2022;10(4):255-262. doi: 10.11648/j.sd.20221004.18

    Copy | Download

  • @article{10.11648/j.sd.20221004.18,
      author = {Li Wenqi and Chen Wurong and Chen Zhaorong and Su Yunsheng and Cai Zhili and Yin Ye and Li Ruoyu},
      title = {The Building Structure of the New Crown Nucleic Acid Testing Laboratory Was Quickly Constructed Several Program Studies},
      journal = {Science Discovery},
      volume = {10},
      number = {4},
      pages = {255-262},
      doi = {10.11648/j.sd.20221004.18},
      url = {https://doi.org/10.11648/j.sd.20221004.18},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.sd.20221004.18},
      abstract = {Natural disasters, especially major infectious disease outbreaks, have brought very heavy disasters to human beings. The novel corona-virus pneumonia that broke out at the end of 2019 has spread to many countries around the world. It has been more than two years so far, and the world's public health security is facing great challenges. Faced with the urgent new demand for new crown testing, laboratory buildings must be fast, flexible and low-cost. This paper introduces the essential requirements for rapid laboratory construction, airflow control, negative pressure environment, and cleanliness under the emergency of COVID-19 testing, and discusses the traditional laboratory construction scheme and new modular air-film structure scheme for rapid laboratory construction at present., box-type container mode scheme; the innovation of the new modular air-film structure product developed has the characteristics of positive and negative pressure conversion, intelligent integration, and environmentally controllable features, which can meet the inherent requirements of the current nucleic acid virus detection, and can be used in A total of 370 Fire Eye laboratories (283 domestic and 95 international) have been launched in 37 countries and regions to help prevent and control the global epidemic.},
     year = {2022}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - The Building Structure of the New Crown Nucleic Acid Testing Laboratory Was Quickly Constructed Several Program Studies
    AU  - Li Wenqi
    AU  - Chen Wurong
    AU  - Chen Zhaorong
    AU  - Su Yunsheng
    AU  - Cai Zhili
    AU  - Yin Ye
    AU  - Li Ruoyu
    Y1  - 2022/08/29
    PY  - 2022
    N1  - https://doi.org/10.11648/j.sd.20221004.18
    DO  - 10.11648/j.sd.20221004.18
    T2  - Science Discovery
    JF  - Science Discovery
    JO  - Science Discovery
    SP  - 255
    EP  - 262
    PB  - Science Publishing Group
    SN  - 2331-0650
    UR  - https://doi.org/10.11648/j.sd.20221004.18
    AB  - Natural disasters, especially major infectious disease outbreaks, have brought very heavy disasters to human beings. The novel corona-virus pneumonia that broke out at the end of 2019 has spread to many countries around the world. It has been more than two years so far, and the world's public health security is facing great challenges. Faced with the urgent new demand for new crown testing, laboratory buildings must be fast, flexible and low-cost. This paper introduces the essential requirements for rapid laboratory construction, airflow control, negative pressure environment, and cleanliness under the emergency of COVID-19 testing, and discusses the traditional laboratory construction scheme and new modular air-film structure scheme for rapid laboratory construction at present., box-type container mode scheme; the innovation of the new modular air-film structure product developed has the characteristics of positive and negative pressure conversion, intelligent integration, and environmentally controllable features, which can meet the inherent requirements of the current nucleic acid virus detection, and can be used in A total of 370 Fire Eye laboratories (283 domestic and 95 international) have been launched in 37 countries and regions to help prevent and control the global epidemic.
    VL  - 10
    IS  - 4
    ER  - 

    Copy | Download

Author Information
  • BGI Genomics Co., Ltd, Shenzhen, China

  • BGI Genomics Co., Ltd, Shenzhen, China

  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd., Changsha, China

  • College of Design and Innovation, Tongji University, Shanghai, China

  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd., Changsha, China

  • BGI Genomics Co., Ltd, Shenzhen, China

  • Shanghai Etopia Building Technology Co., Ltd, Shanghai, China

  • Sections